Tijmen Steenvoorden KYP
Open to conversations Noordwijk, NL

KYP · April 2024 to now

Product designer at KYP, halfway through a frontend migration and a rebrand

What to redesign, when?

5 minute read

I joined KYP, software for construction companies, in April 2024. They were halfway through a frontend migration and a rebrand. I chose to clean up the planning screen instead of redesigning it, because the part people use every day already worked. That gave users two extra rows of planning and cost development almost nothing. Since then support calls have dropped to a handful and daily users have grown from around ten to twelve thousand. The cleanup also turned into the design system the product team builds with today.

The KYP planning screen before: a thick border around the grid, a heavy side navigation and a full row of zoom controls.
Before
The same screen after: no border, the zoom controls floating over the grid, two more rows of planning in view.
After

Old vs new. Same screen, same zoom level. Removing the borders, the padding and the row of zoom controls gave us two extra rows of planning. Drag the handle to compare.

Starting point

KYP had grown like a true startup: not polished, but solving real problems with whatever was at hand.

The frontend was being rebuilt 1:1 from Grails to Angular, so a full redesign wasn't an option. At the same time, the marketing team was working on a rebrand towards a more modern look. That made it urgent for me that the product had to come along.

The KYP Project planning screen before the cleanup: blue header, large side navigation, a dense grid of task blocks and a row of zoom percentages at the bottom.
Planning screen, before. KYP Project, the main tool at the time, while it was being rebuilt 1:1 from Grails to Angular.

What I saw on site

Before touching anything, I went out to see how people actually work. In my first few weeks I visited over twenty construction sites, sitting next to users for an hour at a time, watching them plan and asking what they had to do outside the software. Where were they still falling back on pen and paper or Excel? That taught me something that shaped the whole approach: the daily execution part already worked. People spend about five minutes a day in it and then get on with their job. That's not something you improve by redesigning it. That's something you protect, and make visually clearer.

The cleanup

With that in mind, I did a full UX audit of the existing product. What I found was chaos, especially around color. We had what I started calling "fifty shades of gray". Leftover color variations from different eras of the product, a lot of them from features that were long gone. I brought the grays down to three core shades, unified the rest, and then carefully integrated the new brand colors on top.

There were also a lot of empty HTML elements that were just serving as colored blocks, a thick border around the whole planning area doing nothing, and zoom controls taking up a full horizontal row while they could just sit on top of the planning screen. I proposed removing all of it.

I used Mixpanel data to see what features people actually used. Some things sitting in prime space on the main screen were barely being touched, so those moved down.

By removing all that visual clutter and tidying up the spacing, we gained two full rows of vertical space on the planning screen.

The old planning screen with every tint used to frame and separate the interface circled in red. The same tints as swatches, stepped from lightest to darkest, a few of them blue.
Gray inventory. Left, every tint used to frame and separate the interface, circled on the screen itself. Some of them are blue, but they were being used as grays. Right, the same tints sorted by how dark they are.

Getting it built

The product team was hesitant. They were under massive time pressure from the migration itself, and the last thing they wanted was to introduce new variables into code that was already being rewritten. So I reframed the conversation: "We're not redesigning. We're implementing the rebrand efficiently by removing the clutter that's in the way." That felt safer to them, and they came on board.

They also thought it would be way too much work. But when I sat down with development, it turned out to be surprisingly minimal. Mostly just swapping out color variables and deleting those empty elements. We broke the work into small tickets that could fit into their existing sprint work.

The CEO had a bigger vision though. He wanted to rethink the entire product strategy, moving from four separate tools to one unified brand. I made the case that we do the cleanup and the rebrand now, while we have the window, and start planning the bigger vision at the same time. He accepted that.

That said, I didn't handle every detail perfectly. I made a couple of changes I didn't check with him about first. Things that looked like remnants of old design to me, but that he actually cared about. Fixing them afterwards would have meant going back into code that no longer existed. I should have checked with him first.

During the work itself, bugs kept coming up from the migration, so development and product wanted to skip the design tickets and focus on stability first. Which I get. But the CEO wanted his rebrand visible in the product, so those tickets had to happen. That put me in the middle, defending the design work over and over. Sometimes the pushback was more like "no one's going to notice this anyway." Maybe true for a single border. But all those little things together were exactly the difference between a ten-year-old product and a new one.

What changed

The clearest impact wasn't fewer questions from development, it was better questions. Because the system made things consistent, deviations became visible. Developers started asking "did you do this on purpose?" instead of "what color should this be?" Product went through something similar. Once reusable components existed, they started questioning why we'd build something new when we already had a component that did the job well enough.

When I joined, nobody outside the product team knew product design was a thing. What changed it wasn't a presentation. It was that I could make things visible fast. Sales especially figured out the new guy could turn their wishes into a mockup in an afternoon. It got to the point where I had to set a rule with them: we don't show clients anything we don't intend to build. Some of them still tried to get on my laptop, or take a picture of my screen. Now they pull me into client calls and site visits.

Support calls dropped to a handful. Partly the cleanup, partly because we made the existing help center actually findable. What's left is mostly voucher validation and server issues, not people struggling with the interface. Over the same period the product grew from around ten thousand to twelve thousand daily users. That's mainly the account managers doing their job, but the product held up while it scaled.

The rebuilt KYP planning screen: a light grid of coloured task blocks per week, a slim side navigation and the toolbar in the new blue.
Planning screen, after. The same screen as “Planning screen, before” above, rebuilt. Same information, a lot less noise.

Reflection

What we built was a base, not a strategy. We got a consistent foundation, the new brand in the product, and a shared language between design and dev. That's real. But it's not the same as knowing where the product should go next.

I also never put numbers on what we did while we were doing it. How many colors we removed, how many components, how much dead code. It was a lot, but I can't prove it. That's the thing I'd do differently: measure while you're doing it, not after.

What came next

The cleanup wasn't meant to become a design system. But once we had a small set of colors, real spacing rules, and a handful of consistent components, we basically already had the first building blocks of one.

That foundation is what grew into the design system the team runs on today. Product can assemble a lot of it themselves, and my role has shifted from producing every screen to polishing and making the case for why something works or doesn't. It's also what made the next thing possible: prototyping straight against our real code with Figma and Claude Code, so product and I could try out competing concepts and settle arguments by clicking through them instead of debating static screens.

That's a case study on its own, and I'm writing it up separately.

Component specimens from the design system: buttons, inputs, tabs and planning blocks in the new blue and orange.
Component specimens. A few components from the system that grew out of the cleanup. Kobalt blue and construction orange came from the rebrand.